INSTALLATION PROCEDURE 1. INSTALL NO. 2 ECM BRACKET (a) Install the No. 2 ECM bracket to the ECM with the 2 screws. Torque: 3.0 N·m {31 kgf·cm, 27 in·lbf} 2. INSTALL NO. 1 ECM BRACKET (a) Install the No. 1 ECM bracket to the ECM with the 2 screws. Torque: 3.0 N·m {31 kgf·cm, 27 in·lbf} 3. IN
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT FOR COOLANT LEAK (for Inverter Coolant) (a) Remove the inverter reserve tank cap. CAUTION: To avoid the danger of being burned, do not remove the inverter reserve tank cap while the coolant for the inverter is still hot. (b) Install a radiator cap tester