Lexus NX: 2ar-fxe (starting)

READ NEXT:

 Power Switch

ComponentsCOMPONENTS ILLUSTRATION *1 INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY *2 POWER SWITCH RemovalREMOVAL PROCEDURE 1. REMOVE INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Click h

 Cruise Control

 Camera Heater

ComponentsCOMPONENTS ILLUSTRATION *1 FORWARD RECOGNITION WITH HEATER HOOD SUB-ASSEMBLY - - RemovalREMOVAL PROCEDURE 1. REMOVE FORWARD RECOGNITION CAMERA Click here 2. REMOVE FORWARD R

SEE MORE:

 Reassembly

REASSEMBLY CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. INSTALL NO. 3 MOULDING TAPE (a) Clean the No. 3 moulding tape installation surface. (1) When reusing the side mudguard LH, remove the double-si

 Inspection

INSPECTION CAUTION / NOTICE / HINT NOTICE: When using a vise, place aluminum plates between the part and vise. When using a vise, do not overtighten it. PROCEDURE 1. INSPECT ELECTRIC POWER STEERING COLUMN SUB-ASSEMBLY (a) Inspect the preload. (1) Secure the electric power steering column

© 2016-2025 Copyright www.lexunx.com