Lexus NX: Absorber Control Switch

READ NEXT:

 Components

COMPONENTS ILLUSTRATION *1 CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY *2 INSTRUMENT SIDE PANEL LH *3 INSTRUMENT SIDE PANEL RH *4 LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

 Removal

REMOVAL PROCEDURE 1. REMOVE CONSOLE ARMREST ASSEMBLY Click here 2. REMOVE UPPER REAR CONSOLE PANEL Click here 3. REMOVE UPPER NO. 2 CONSOLE PANEL GARNISH Click here 4. REMOVE UPPER NO. 1 CONSOLE

 Inspection

INSPECTION PROCEDURE 1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (ABSORBER CONTROL SWITCH) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Te

SEE MORE:

 Inspection

INSPECTION PROCEDURE 1. INSPECT HEATER ACCESSORY ASSEMBLY *a Component without harness connected (Heater Accessory Assembly (Heater Water Pump)) (a) Check the motor operation. (1) Apply the positive (+) lead of the auxiliary battery to terminal 2 and the negative (-) lead to terminal 1. OK:

 Vehicle Control History

VEHICLE CONTROL HISTORY CHECK VEHICLE CONTROL HISTORY HINT: The vehicle control history data stores the history of the reject function and system protection operations. for Triple Beam Headlight: Click here for Single Beam Headlight: Click here

© 2016-2026 Copyright www.lexunx.com