Lexus NX: Front Door Window Frame Moulding

Lexus NX Service Manual / Vehicle Exterior / Exterior Panels / Trim / Front Door Window Frame Moulding

READ NEXT:

 Components

COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified

 Removal

REMOVAL CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. PRECAUTION NOTICE: After the power switch off

 Installation

INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. INSTALL FRONT DOOR OUTSIDE MOULDING SUB-A

SEE MORE:

 Problem Symptoms Table

PROBLEM SYMPTOMS TABLE NOTICE: When replacing the combination meter assembly, always replace it with a new one. If a combination meter assembly which was installed to another vehicle is used, the information stored in it will not match the information from the vehicle and a DTC may be stored. HINT:

 Installation

INSTALLATION PROCEDURE 1. INSTALL CLOCK ASSEMBLY (a) Attach the 2 claws to install the clock assembly. 2. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (a) Connect the connectors. (b) Attach the 6 clips to install the air conditioning control assembly. 3. INSTALL CENTER INS

© 2016-2025 Copyright www.lexunx.com