Lexus NX: Installation

INSTALLATION

PROCEDURE

1. INSTALL TILT AND TELESCOPIC SWITCH

(a) Attach the claw to install the tilt and telescopic switch.

(b) Connect the connector.

2. INSTALL LOWER STEERING COLUMN COVER

(a) Attach the 2 claws to install the lower steering column cover.

NOTICE:

Do not damage the tilt and telescopic switch.

(b) Install the 3 screws.

3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

4. INITIALIZATION AFTER RECONECTING AUXILIARY BATTERY TERMINAL

Click here

HINT:

When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.

Click here

5. INSTALL DECK FLOOR BOX LH

Click here

6. INSTALL REAR DECK FLOOR BOX

Click here

7. INSTALL NO. 3 DECK BOARD SUB-ASSEMBLY

Click here

8. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM

(a) Reset the auto tilt away function setting to the previous condition by changing the customize parameter.

Click here

READ NEXT:

 Steering Gear / Linkage

 Steering Gear

 Components

COMPONENTS ILLUSTRATION *1 FRONT FLOOR COVER CENTER LH *2 NO. 1 ENGINE UNDER COVER *3 REAR ENGINE UNDER COVER LH *4 REAR ENGINE UNDER COVER RH ILLUSTRATION *1 FRONT STABIL

SEE MORE:

 Dtc Check / Clear

DTC CHECK / CLEAR CHECK DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / Main Body / Trouble Codes. Body Electrical > Main Body > Trouble Codes (e) Check the details of the DTCs. Click he

 Installation

INSTALLATION PROCEDURE 1. INSTALL IGNITION COIL ASSEMBLY Click here 2. INSTALL SENSOR WIRE (a) Install the sensor wire with the bolt. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} (b) Connect the knock control sensor connector. 3. INSTALL INJECTOR VIBRATION INSULATOR Click here 4. INSTALL FUEL DELI

© 2016-2025 Copyright www.lexunx.com