INSTALLATION
PROCEDURE
1. INSTALL METER MIRROR SUB-ASSEMBLY (HEADUP DISPLAY)
(a) Install the meter mirror sub-assembly (headup display) with the 4 screws. |
|
(b) Connect the connector.
2. INSTALL NO. 1 HEATER TO REGISTER DUCT SUB-ASSEMBLY
(a) Install the No. 1 heater to register duct sub-assembly with the 3 screws.
3. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY
Click here
4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
5. INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
Click here
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.
Click here
6. ENABLE AUTOAWAY/RETURN FUNCTION
(a) Restore the autoaway/return function setting to the previous condition by changing the customize parameter.
Click here
7. CHECK SRS WARNING LIGHT
Click here
8. INSTALL DECK FLOOR BOX LH
Click here
9. INSTALL REAR DECK FLOOR BOX
Click here
10. INSTALL NO. 3 DECK BOARD SUB-ASSEMBLY
Click here