INSTALLATION PROCEDURE 1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY NOTICE: Before installing the transmission control cable assembly, check that the shift lever position sensor and the shift lever are in neutral. (a) Install the transmission control cable assembly to the body with the 2 bolts.
OPERATION CHECK CHECK SLIDING ROOF NOTICE:
If the negative battery terminal is disconnected under the following conditions, initialization of the sliding roof drive gear sub-assembly may not be completed. In this case, perform initialization.
Within 2 seconds after roof glass operation stops.