INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. INSTALL ROOF RACK ASSEMBLY (a) Install the roof rack assembly with the 5 nuts. Torque: 16 N·m {163 kgf·cm, 12 ft·lbf} 2. INSTALL ROOF HEA
DATA LIST / ACTIVE TEST NOTICE: In the table below, the values listed under "Normal Condition" are reference values. Do not depend solely on these reference values when deciding whether a part is faulty or not. HINT: Using the Techstream to read the Data List allows the values or states of switches,