TERMINALS OF ECU COMBINATION METER ASSEMBLY (a) Measure the voltage, resistance and waveform according to the value(s) in the table below. Terminal No. (Symbol) Wiring Color Terminal Description Condition Specified Condition I10-2 (MSM+) - Body ground L - Body ground Steering pad
INSTALLATION PROCEDURE 1. INSTALL SERVICE PLUG GRIP CAUTION: Wear insulating gloves. NOTICE: Before connecting the service plug, check that no parts and tools remain and that the high voltage terminals and connectors are connected securely. (a) Wear insulated gloves and install the service plug grip