OPERATION CHECK AUTOMATIC HIGH BEAM SYSTEM OPERATION CHECK (a) Check the operation of the automatic high beam indicator light. *a Automatic High Beam Indicator Light NOTICE: If the forward recognition camera cannot correctly recognize the front due to bad weather (dense fog, etc.) or obstru
INSTALLATION PROCEDURE 1. INSTALL NO. 2 ECM BRACKET (a) Install the No. 2 ECM bracket to the ECM with the 2 screws. Torque: 3.0 N·m {31 kgf·cm, 27 in·lbf} 2. INSTALL NO. 1 ECM BRACKET (a) Install the No. 1 ECM bracket to the ECM with the 2 screws. Torque: 3.0 N·m {31 kgf·cm, 27 in·lbf} 3. IN