Lexus NX: 2ar-fxe (lubrication)

READ NEXT:

 Engine Oil Cooler

ComponentsCOMPONENTS ILLUSTRATION *1 OIL COOLER ASSEMBLY *2 GASKET *3 SEAL WASHER *4 UNION BOLT N*m (kgf*cm, ft.*lbf): Specified torque ● Non-reusable part Remova

 Lubrication System

On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT ENGINE OIL LEVEL (a) Put the engine in inspection mode (maintenance mode). Click here (b) Warm up and stop the engine 5 minutes later

 Oil And Oil Filter

SEE MORE:

 Disposal

DISPOSAL CAUTION / NOTICE / HINT CAUTION: Before performing pre-disposal deployment of any SRS part, review and closely follow all applicable environmental and hazardous material regulations. Pre-disposal deployment may be considered hazardous material treatment. PROCEDURE 1. PRECAUTION CAUTION:

 Installation

INSTALLATION PROCEDURE 1. INSTALL NO. 4 ANTENNA CORD SUB-ASSEMBLY (a) Attach the 2 clamps and guide to install the No. 4 antenna cord sub-assembly. (b) Install the bolt and attach the 2 clamps to install the washer hose. (c) Connect each connector. 2. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY (a) When

© 2016-2026 Copyright www.lexunx.com