InspectionINSPECTION PROCEDURE 1. INSPECT COMBINATION SWITCH ASSEMBLY (BLIND SPOT MONITOR MAIN SWITCH) (a) Remove the combination switch assembly. Click here (b) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Switch Condition