REMOVAL PROCEDURE 1. PRECAUTION CAUTION: Be sure to read Precoution thoroughly before serving. Click here NOTICE: After turning the power switch off, there may be a waiting time before disconnecting
INSTALLATION PROCEDURE 1. INSTALL BRAKE BOOSTER GASKET (a) Install a new brake booster gasket to the brake booster with master cylinder assembly. 2. INSTALL BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT SHIFT LEVER ASSEMBLY (a) Inspect shift lock operation. (1) Move the shift lever to P. (2) Turn the power switch off. (3) Check that the shift lever cannot be moved from P to any other position. (4) Turn the power switch on (READY), depress the brake pedal,
DESCRIPTION The manifold absolute pressure sensor detects the intake manifold pressure as a change in voltage. The ECM calculates the intake manifold pressure based on this voltage. The ECM calculates the EGR valve assembly and purge VSV opening amount according to changes in the intake manifold pr