INSTALLATION PROCEDURE 1. INSTALL IGNITION COIL ASSEMBLY Click here 2. INSTALL SENSOR WIRE (a) Install the sensor wire with the bolt. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} (b) Connect the knock control sensor connector. 3. INSTALL INJECTOR VIBRATION INSULATOR Click here 4. INSTALL FUEL DELI
DESCRIPTION When the power switch is turned on (IG), auxiliary battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes current to flow to the coil of the EFI-MAIN relay, closing the contacts of the EFI-MAIN relay and supplying power to t