Lexus NX: Canister
READ NEXT:
COMPONENTS ILLUSTRATION *1 CANISTER PUMP MODULE *2 CHARCOAL CANISTER ASSEMBLY *3 FRONT FLOOR COVER CENTER LH *4 VENT LINE HOSE *5 AIR INLET LINE HOSE *6 PURGE LINE HOSE
REMOVAL PROCEDURE 1. REMOVE FRONT FLOOR COVER CENTER LH Click here 2. REMOVE CHARCOAL CANISTER ASSEMBLY (a) Disconnect the connector from the canister pump module. *1 Vent Line Ho
INSPECTION PROCEDURE 1. INSPECT CHARCOAL CANISTER ASSEMBLY (a) Visually check the charcoal canister assembly for cracks or damage. If cracks or damage is found, replace the charcoal canister assemb
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (a) Apply a light coat of engine oil to a new O-ring and install the O-ring to the camshaft timing oil control valve assembly. NOTICE: Do not damage the O-ring when installing. HINT: An O-ring is already installed in a new
INSTALLATION CAUTION / NOTICE / HINT HINT: Perform "Inspection After Repairs" after replacing the throttle with motor body assembly. Click here PROCEDURE 1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY HINT: Perform "Inspection After Repairs" after replacing the throttle with motor body assembly. Cli