Lexus NX: Initialization
INITIALIZATION
INITIALIZATION SERVO MOTOR
(a) Turn the power switch off.
(b) Connect the Techstream to the DLC3.
(c) Turn the power switch on (IG).
(d) Press the A/C OFF switch.
(e) Turn the Techstream on.
(f) Enter the following menus: Body Electrical / Air Conditioner / Utility / Servomotor Initialization.
(g) According to the Techstream display, perform servo motor initialization.
Body Electrical > Air Conditioner > Utility
Tester Display |
Servomotor Initialization |
HINT:
During initialization, the A/C AUTO indicator light comes on, and then goes off when initialization has finished.
(h) According to the Techstream display, select the "Exit" switch to finish initialization.
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE:
If the auxiliary battery voltage is low, the PTC heater, seat heater system (w/ Seat Heater System) and climate control seat system (w/ Climate Control Seat System) m
DTC CHECK / CLEAR DTC CHECK USING TECHSTREAM (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / Air
TERMINALS OF ECU AIR CONDITIONING AMPLIFIER ASSEMBLY (a) Disconnect the I50 air conditioning amplifier assembly connector. (b) Measure the resistance and voltage according to the value(s) in the tabl
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT QUICK HEATER ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition A-1 (B) - B-1 (E) Always Below 1 Ω A-2 (E) - B-2 (B) Always Below 1 Ω A
INSPECTION PROCEDURE 1. INSPECT SHIFT LOCK CONTROL ECU (a) Measure the voltage according to the value(s) in the table below. Standard Voltage: Tester Connection Condition Specified Condition 5 (IG) - Body ground Power switch on (IG) 11 to 14 V Power switch off Below 1 V
© 2016-2024 Copyright www.lexunx.com