1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (ELECTRIC PARKING BRAKE SWITCH)

(a) Install the integration control and panel assembly (electric parking brake switch) to the upper rear console panel sub-assembly with the 2 screws.

HINT:

The locations labeled A in the illustration are tightened together with the shift position indicator.

2. INSTALL SHIFT POSITION INDICATOR

Click here

3. INSTALL UPPER REAR CONSOLE PANEL SUB-ASSEMBLY

Click here

4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

Click here

5. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY

Click here

6. INSTALL NO. 2 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY

Click here

7. INSTALL INSTRUMENT SIDE PANEL RH

Click here

8. INSTALL NO. 1 SWITCH HOLE BASE

Click here

9. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

Click here

10. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

Click here

11. INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY

Click here

12. INSTALL INSTRUMENT SIDE PANEL LH

Click here

13. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH

Click here

14. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH

Click here

15. INSTALL UPPER REAR CONSOLE PANEL

Click here

16. INSTALL CONSOLE ARMREST ASSEMBLY

Click here

READ NEXT:

 Electric Parking Brake System

 Precaution

PRECAUTION TROUBLESHOOTING PRECAUTIONS (a) When there is a malfunction with terminal contact points or a problem with the installation of a part, reconnecting the connectors or removal/installation of

 Parts Location

PARTS LOCATION ILLUSTRATION *1 NO. 1 ENGINE ROOM RELAY BLOCK EPB NO. 1 FUSE EPB NO. 2 FUSE HINT: EPB stands for Electric Parking Brake. *2 NO. 2 ENGINE ROOM RELAY BLOCK ECU-B NO.

SEE MORE:

 Motor High-voltage Circuit

DESCRIPTION The cause of the malfunction may be the high-voltage circuit of the motor. Check the motor internal resistance and the connection condition of the high-voltage line between the inverter and motor to check whether there is an open or short circuit. Related Parts Check Area Inspection

 Installation

INSTALLATION PROCEDURE 1. INSTALL NO. 3 INDOOR ELECTRICAL KEY ANTENNA ASSEMBLY NOTICE: Do not reuse dropped or damaged parts. (a) Connect the connector. (b) Attach the clamp to install the No. 3 indoor electrical key antenna assembly. 2. INSTALL NO. 2 TOOL BOX SUB-ASSEMBLY Click here 3. INSTALL

© 2016-2025 Copyright www.lexunx.com