Lexus NX: Precaution

PRECAUTION

NOTICE:

When disassembling the headlight assembly, use static electricity countermeasures SST (desktop antistatic mat set) and observe all precautions to prevent damage to the system by electrostatic discharge (ESD).

STATIC ELECTRICITY COUNTERMEASURES SST

SST:Desktop antistatic mat set (09890-47010)

  • Wristband

    SST:

    09891-04020

  • Wristband connection wire (No. 1 grounding wire)

    SST:

    09891-04030

  • Antistatic mat

    SST:

    09891-04010

  • Ground connection wire (No. 2 grounding wire)

    SST:

    09891-04040

PRECAUTIONS DURING REPLACEMENT

(a) Precautions during procedures:

(1) Before performing any procedures, touch an unpainted metal part or ground bolt of the vehicle to eliminate any static electricity.

(2) To prevent damage to electrical equipment, disconnect the battery power supply before installing and removing electrical equipment.

(3) Never touch the electronic parts of a printed wire board or the pins of an integrated circuit.

(4) When performing procedures, do not allow clothing to come near or contact parts.

(b) Wear the SST (wristband) firmly on your wrist.

SST:

09891-04020

(c) Connect the SST (No. 2 grounding wire) and SST (antistatic mat) to an appropriate grounding point in the workspace and on the work table.

SST:

09891-04040

09891-04010

HINT:

When working inside the vehicle:

Connect SST (No. 2 grounding wire) to the unpainted metal part of a grounded bolt, etc.

(d) Connect SST (No. 1 grounding wire), SST (wristband) and SST (antistatic mat).

SST:

09891-04030

(e) Always place the headlight assembly and its components on SST (antistatic mat).

READ NEXT:

 Components

COMPONENTS ILLUSTRATION *1 HEADLIGHT ASSEMBLY LH - - N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUSTRATION *1 HEADLIGHT ECU SUB-ASSEMBLY LH *2 HEADLIGHT GASKET

 Removal

REMOVAL CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure described below is for the LH side. PROCEDURE 1. REMOVE FRONT BUMPER ASSEMBLY (a) except Spo

 Disassembly

DISASSEMBLY PROCEDURE 1. PRECAUTION NOTICE: Be sure to read Precaution thoroughly before servicing. Click here Do not reuse parts which have reduced fastening ability due to thread damage. Wh

SEE MORE:

 Throttle Actuator Control Motor Current Range / Performance (P2118)

DESCRIPTION The electronic throttle control system has a dedicated power supply circuit. The voltage (+BM) is monitored and when it is low (less than 4 V), the ECM determines that there is a malfunction in the electronic throttle control system and cuts off the current to the throttle actuator. When

 Inspection

INSPECTION PROCEDURE 1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 4 (+) - 1 (GND) Switch not pushed 10 kΩ or higher

© 2016-2025 Copyright www.lexunx.com