Lexus NX: Inspection
INSPECTION
PROCEDURE
1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH)
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection | Condition | Specified Condition | 4 (+) - 1 (GND) | Switch not pushed | 10 kΩ or higher | Switch pushed | Below 1 Ω | If the result is not as specified, replace the integration control and panel assembly (VSC OFF switch). | | *a | Component without harness connected (Integration Control and Panel Assembly (VSC OFF Switch)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH) (a) Install the integration control and panel assembly (VSC OFF switch) to the upper rear console panel sub
SEE MORE:
DESCRIPTION The shift lever position sensor sends 7 different switch signals to the hybrid vehicle control ECU. The hybrid vehicle control ECU uses these signals to detect the shift lever position (P, R, N, D or S). The hybrid vehicle control ECU also uses this information to determine the intended
ComponentsCOMPONENTS ILLUSTRATION *1 HOOD STAY BRACKET LH *2 HOOD SUPPORT ASSEMBLY *3 STOP RING - - N*m (kgf*cm, ft.*lbf): Specified torque - - RemovalREMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for both the RH and LH side.
The procedure desc
© 2016-2025 Copyright www.lexunx.com
