Lexus NX: Inspection
INSPECTION
PROCEDURE
1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH)
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection | Condition | Specified Condition | 4 (+) - 1 (GND) | Switch not pushed | 10 kΩ or higher | Switch pushed | Below 1 Ω | If the result is not as specified, replace the integration control and panel assembly (VSC OFF switch). | | *a | Component without harness connected (Integration Control and Panel Assembly (VSC OFF Switch)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH) (a) Install the integration control and panel assembly (VSC OFF switch) to the upper rear console panel sub
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT TIRES (a) Check the tires for wear and proper inflation pressure. Specified Pressure (When Tire is Cool): Tire Size Front kPa (kgf/cm2, psi) Rear kPa (kgf/cm2, psi) 225/65R17 102H 240 (2.4, 35)*1 250 (2.5, 36)*2 240 (2.4, 35)*1 250 (2.5, 36)*2 225/
DESCRIPTION The resistance of the thermistor built into the generator temperature sensor changes in accordance with changes in generator (MG1) temperature. The lower the generator (MG1) temperature, the higher the thermistor resistance. Conversely, the higher the generator (MG1) temperature, the low