Lexus NX: Removal

REMOVAL

PROCEDURE

1. PRECAUTION

Click here

2. CHECK FOR DTC

(a) Check for DTCs.

Click here

NOTICE:

Confirm that P0AA6 (Hybrid Battery Voltage System Isolation Fault) is not output before removing or installing an HV battery module. If this DTC is output, perform troubleshooting for this DTC first.

Click here

3. REMOVE SERVICE PLUG GRIP

Click here

4. DISCONNECT WIRE HARNESS

Click here

5. DISCONNECT INVERTER RESERVE TANK ASSEMBLY

Click here

6. REMOVE CONNECTOR COVER ASSEMBLY

Click here

7. CHECK TERMINAL VOLTAGE

Click here

8. INSTALL CONNECTOR COVER ASSEMBLY

Click here

9. REMOVE REAR SEAT ASSEMBLY

for Manual Seat: Click here

for Power Seat: Click here

10. REMOVE NO. 2 HYBRID VEHICLE BATTERY SHIELD REINFORCEMENT

Click here

11. REMOVE HV BATTERY JUNCTION BLOCK ASSEMBLY

CAUTION:

Wear insulated gloves and use insulated tools.

(a) Using an insulated tool, remove the 3 nuts, and disconnect the 2 No. 2 frame wires (high-voltage cables) and ground terminal.

*a

Ground Terminal

(b) Disconnect the 4 connectors.

NOTICE:

Insulate the removed connector with insulating tape.

(c) Remove the 3 nuts and hybrid junction block assembly.

NOTICE:

If the hybrid battery junction block assembly has been dropped, replace it with a new one.

READ NEXT:

 Inspection

INSPECTION PROCEDURE 1. INSPECT HV BATTERY JUNCTION BLOCK ASSEMBLY (a) Inspect SMRB: (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connect

 Installation

INSTALLATION PROCEDURE 1. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY CAUTION: Wear insulated gloves and use insulated tools. (a) Install the hybrid battery junction block assembly with the 3 nuts. Tor

 Hybrid Control System

SEE MORE:

 How To Proceed With Troubleshooting

CAUTION / NOTICE / HINT HINT: *: Use the Techstream. PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP NEXT 2. INSPECT AUXILIARY BATTERY VOLTAGE Standard voltage: 11 to 14 V If the voltage is below 11 V, recharge or replace the auxiliary battery before proceeding. NE

 Installation

INSTALLATION PROCEDURE 1. INSTALL ENGINE WATER PUMP ASSEMBLY (a) Install a new gasket and the engine water pump assembly with the 5 bolts in the order shown in the illustration. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} 2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY (a) Using a 12 mm

© 2016-2024 Copyright www.lexunx.com