COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUSTRATION *1 DOOR SCUFF PLATE ASSEMBLY LH *2 FRONT DOOR OPENING TRIM
INSTALLATION PROCEDURE 1. INSPECT COMPRESSOR OIL (a) When replacing the compressor assembly with motor with a new one, gradually discharge the inert gas from the service valve, and drain the following amount of oil from the new compressor assembly with motor before installation. Standard: (Oil c