Lexus NX: Engine Switch/Power Switch Malfunction (C13A2)

Lexus NX Service Manual / Brake / Parking Brake / Electric Parking Brake System / Engine Switch/Power Switch Malfunction (C13A2)

DESCRIPTION

When the power switch is turned on (IG), power is supplied to the parking brake ECU assembly. This DTC is stored if the IG power source is not input to the parking brake ECU assembly when communication with other ECUs occurs.

DTC No.

Detection Item

DTC Detection Condition

Trouble Area

Memory

Note

C13A2

Engine Switch/Power Switch Malfunction

Both of the following conditions are met:

  • Power switch on (IG)
  • When the hybrid vehicle control ECU communicates with the main body ECU (multiplex network body ECU) via CAN communication, IG power supply is not received for approx. 3 seconds.
  • Wire harness or connector
  • IG power source circuit
  • Parking brake ECU assembly

Yes

An electric parking brake system malfunction is displayed on the multi-information display.

WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:

  • Inspect the fuses for circuits related to this system before performing the following inspection procedure.
  • Before disconnecting connectors or fuses, turn the power switch off and wait 20 seconds or more.
  • When replacing the parking brake ECU assembly, operate the electric parking brake switch (integration control and panel assembly), as the parking brake indicator light (red) blinks when the power switch is first turned on (IG).

PROCEDURE

1.

READ VALUE USING TECHSTREAM (IG STATUS / IG SWITCH)

(a) Turn the power switch off.

(b) Connect the Techstream to the DLC3.

(c) Turn the power switch on (IG) and the Techstream on.

(d) Enter the following menus: Chassis / Electric Parking Brake / Data List.

(e) Check the values by referring to the table below.

Chassis > Electric Parking Brake > Data List

Tester Display

Measurement Item

Range

Normal Condition

IG Status

Power switch information display

ON or OFF

ON: Power switch is on (IG)

OFF: Power switch is on (ACC) or off

IG Switch

IG power source information display

ON or OFF

ON: IG power source is input into parking brake ECU assembly

OFF: IG power source is not input into parking brake ECU assembly

Chassis > Electric Parking Brake > Data List

Tester Display

IG Status

IG Switch

NG

GO TO STEP 3

OK

2.

CHECK DTC

(a) Clear the DTCs.

Click here

Chassis > Electric Parking Brake > Clear DTCs

(b) Turn the power switch off.

(c) Check for DTCs.

Click here

Chassis > Electric Parking Brake > Trouble Codes
DTC is output

REPLACE PARKING BRAKE ECU ASSEMBLY

DTC is not output

USE SIMULATION METHOD TO CHECK

3.

CHECK HARNESS AND CONNECTOR (PARKING BRAKE ECU ASSEMBLY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)

(a) Turn the power switch off.

(b) Disconnect the Q24 and Q25 parking brake ECU assembly connectors.

(c) Disconnect the 4A instrument panel junction block assembly connector.

(d) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

Q24-5 (IG) - 4A-32

Always

Below 1 Ω

Q24-5 (IG) or 4A-32 - Body ground

Always

10 kΩ or higher

Q25-9 (GND1) - Body ground

Always

Below 1 Ω

OK

REPAIR IG POWER SOURCE CIRCUIT

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

READ NEXT:

 Open or Short Circuit in Lock Switch Circuit (C13A3,C13AB)

DESCRIPTION When the electric parking brake switch (integration control and panel assembly) is pulled to the lock side, a lock request signal is output to the parking brake ECU assembly. DTC No.

 Open or Short Circuit in Release Switch Circuit (C13A4,C13AC)

DESCRIPTION When the electric parking brake switch (integration control and panel assembly) is pushed to the release side, a release request signal is output to the parking brake ECU assembly. DTC

 Open or Short Circuit in Motor (C13A6)

DESCRIPTION DTC No. Detection Item DTC Detection Condition Trouble Area Memory Note C13A6 Open or Short Circuit in Motor Both of following conditions are met: Power switch on (

SEE MORE:

 Inspection

INSPECTION PROCEDURE 1. INSPECT OUTER MIRROR LH (a) Check the outer mirror heater operation. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 1 - 2 25°C (77°F) 6.8 to 10.2 Ω If the r

 Installation

INSTALLATION PROCEDURE 1. INSTALL FRONT DRIVE SHAFT HOLE SNAP RING LH (a) Install a new front drive shaft hole snap ring LH. NOTICE: Do not damage the spline of the front drive inboard joint assembly LH. Front drive shaft hole snap ring LH should be installed completely. 2. INSTALL FRONT DRI

© 2016-2024 Copyright www.lexunx.com