Lexus NX: Installation

INSTALLATION

CAUTION / NOTICE / HINT

NOTICE:

  • When the brake pedal is first depressed after replacing the brake pads or pushing back the disc brake piston, DTC C1214 may be output. As there is no malfunction, clear the DTC.
  • While the auxiliary battery is connected, even if the power switch is off, the brake control system activates when the brake pedal is depressed or the door courtesy switch is turned on. Therefore, even if only brake shoes are to be removed and installed, be sure to perform the Disable Brake Control procedure and disconnect the cable from the negative (-) terminal of the auxiliary battery before beginning work.

HINT:

  • Use the same procedure for the RH and LH sides.
  • The procedure listed below is for the LH side.

PROCEDURE

1. INSTALL FRONT LOWER BALL JOINT ASSEMBLY LH

(a) Secure the front axle assembly between aluminum plates in a vise.

NOTICE:

When using a vise, do not overtighten it.

(b) Install the front lower ball joint to the front axle assembly with the nut.

Torque:

133 N·m {1356 kgf·cm, 98 ft·lbf}

(c) Install a new clip.

NOTICE:

  • If the holes for the clip are not aligned, align the holes by tightening the nut as necessary up to an additional 60°.
  • Make sure the claws of the clip are fully inserted into the grooves of the nut.

2. INSTALL FRONT AXLE ASSEMBLY LH

Click here

READ NEXT:

 Front Lower Suspension Arm

ComponentsCOMPONENTS ILLUSTRATION *1 FRONT LOWER NO. 1 SUSPENSION ARM SUB-ASSEMBLY LH *2 FRONT SUSPENSION CROSSMEMBER SUB-ASSEMBLY N*m (kgf*cm, ft.*lbf): Specified torque * For u

 Front Shock Absorber

 Components

COMPONENTS ILLUSTRATION *A w/o AVS - - *1 FRONT FLEXIBLE HOSE *2 FRONT SHOCK ABSORBER WITH COIL SPRING *3 FRONT SPEED SENSOR LH *4 FRONT STABILIZER LINK ASSEMBLY LH *

SEE MORE:

 System Description

SYSTEM DESCRIPTION OUTLINE OF COMBINATION METER ASSEMBLY *a Indication Example *b Hybrid System Indicator or Tachometer *c Speedometer *d Power Condition ODO/TRIP Meter *e Engine Coolant Temperature Receiver Gauge *f Fuel Receiver Gauge *g Multi-informatio

 Inspection

INSPECTION PROCEDURE 1. INSPECT ACCELERATION SENSOR (a) Connect 3 1.5 V dry cell batteries in series. (b) Connect a positive (+) lead from the batteries to terminal 3 (SGB) and a negative (-) lead to terminal 2 (SGG). (c) Measure the voltage according to the value(s) in the table below. Standard Vol

© 2016-2025 Copyright www.lexunx.com